Design and analysis of building automation system

2022-08-08
  • Detail

Tianjin International Trade Center building automation system design analysis

1 design purpose

1.1 effectively save electric energy this system uses computer programs to monitor the equipment in the whole building to manage the power consumption of the equipment at different times, so that the equipment will always be in the best running state, reduce unnecessary waste, and achieve the purpose of saving electricity. Using this system can save electric energy by 15%~25%

1.2 a lot of manpower is saved. In buildings that do not use bas, a lot of manpower is needed to complete the simple operation, maintenance and servicing of equipment; However, after using this system, the above work is automatically completed by the computer according to the program, which can save 40% to 60% of manpower

1.3 extend the service life of the equipment

the equipment is always in the best running state under the unified management of the computer, and timely report the failure of the equipment and deal with it; Print maintenance and service reports according to the operating conditions of the equipment to avoid advance or delayed maintenance, and correspondingly prolong the service life of the equipment is also equivalent to saving money

1.4 effectively strengthen personnel management

in buildings that do not adopt building automation in the electro-hydraulic servo fatigue testing machine that forces vibration, it is difficult for relevant leaders to know whether the operators deal with equipment failures and maintenance in time. However, the building automation system is managed by computers in a unified way, and the computer will not be used for wood packaging import and export quarantine. It has become the resonance of the industry to hide and deceive anyone, so that the relevant leaders can timely grasp the first-hand information and avoid various problems of personnel management

1.5 ensure the safety of buildings and people

this system monitors the operation of various equipment, which can enable the personnel on duty to find faults in time, eliminate hidden dangers, and ensure the safety of buildings and people. It is suitable for mechanical experiments in steel plants, quality inspection stations, scientific research, colleges and Universities and other units

2 control and management of the air conditioning system

2.1 control and management scope

the air conditioning system includes the refrigerator and heat exchange station located on the ground floor, the cooling tower located on the top floor of the podium, the main tower and the double tower, the refrigeration station and heat exchange station located on the 34th floor, the cold and hot water heat exchange station located on the 11th floor, and the cold and hot water circulation system for the air conditioning of the whole building, a variety of exhaust fans of fresh air units and air conditioning units, and fan equipment in various areas and rooms VAV box and other terminal equipment

2.2 main functions

the main purpose of the control and management of the air conditioning system is to ensure the normal operation of the whole building, so that the environmental parameters of each part can meet the use requirements at all times, while saving operating energy consumption, facilitating the maintenance and management of thousands of various air conditioning equipment, and ensuring a high equipment integrity rate. In order to achieve this goal, the control management system mainly includes: system status monitoring, measurement, environmental control and equipment management command functions

2.2.1 system status monitoring

for the monitoring of the environmental status of each main room and building area (lobby, shopping mall Hall), the main monitoring parameter is the air temperature. For individual important and representative points, the relative humidity of the air is monitored at the same time

monitoring the working state (on, off) and operating parameters (air temperature and humidity, water temperature, motor current, filter pressure drop, pressure at key points of water system, flow of some main circuits, etc.) of all main equipment (chillers, water pumps, air handling equipment, cooling towers, etc.)

the above measured parameters are sent to the air conditioning control center of each division through the computer system, where reports can be displayed and printed in various ways, and stored in the computer for a long time, and made into CD copies for archiving

2.2.2 cold and heat measurement

since the building will be divided into several property management groups and managed independently, it is necessary to measure the energy consumption of air conditioning operation in each part of the building separately for management and settlement. The main measurement contents are: measurement of cooling capacity of two refrigeration stations on the underground and 34th floor; Measurement of total steam inlet and steam volume of each main branch; Measurement of cooling capacity and heat transmitted through the 11th floor control station; Heat calculation of control stations on the 34th and 53rd floors

generally, excellent alloy structural steel measurement system is selected through the above 1, which can accurately measure and count the cold and heat used by hotels, office buildings, shopping malls and clubs, as well as the cold and heat output from each cold and heat source station. These information is simultaneously transmitted to the air conditioning control center of each division and entered into the database, which is connected to the settlement system in MIS

for rented office buildings and clubs, since the air conditioning system is a unified system, IC card drive controller is set at each end (VAV end is preliminarily recommended). That is, the terminal device starts working only after the user inserts the IC card of timing. The system will automatically charge the air conditioning fee from the IC card according to the opening time of the terminal device

2.2.3 environmental control

in order to ensure the environmental control effect of the whole building and reduce the workload of operation and maintenance, the whole air conditioning system implements computer full-automatic control. This mainly includes three levels:

(1) the remote transmission control of each equipment. The personnel on duty can directly start/stop each fan water pump, adjust the valve and change the set value of some equipment automatic control system through the computer in the control center of each division, so that most of the operation regulation and control work can be controlled by the computer in the control center of each division

(2) the automatic control of each equipment itself, such as refrigerator, air conditioner and heat exchanger, can realize the automatic adjustment and protection of the equipment through its supporting field controller

(3) the overall coordination and control of the system, because the air conditioning system is a whole system, and all parts are integrated with each other, in order to achieve the purpose of safe, reliable and energy-saving operation and regulation. For example, the VAV system used in office buildings and clubs, the air supply state and fan speed required by the air conditioning processing room need to be determined by the working state of the VAV terminal device in each room under its jurisdiction. It is suggested that the hotel adopt the half four pipe method. The key lies in whether the control system can monitor the thermal status of each area of the hotel and the requirements for cold and heat sources, so as to adjust the water supply pipe valves. In addition, the mall system controls the fresh air volume through CO2 concentration monitoring, the water source heat pump system of the apartment controls the cooling tower and auxiliary heat source, and the number of start-up and stop of each cold and heat source and the water supply temperature can only be coordinated and controlled on the basis of comprehensive system analysis, so as to give full play to its effect

2.2.4 intelligent management of equipment

the management function of the air conditioning control management system is reflected in the information management and fault analysis of the equipment under its jurisdiction, mainly including:

storing various technical parameters, drawings and installation positions of all equipment for real-time inquiry by maintenance and operation management personnel

establish the archives of main equipment, automatically prepare various maintenance plans, and record the maintenance and repair status of each time

use the measured data to conduct a comprehensive analysis, find out the possible faults of the equipment or system, give an alarm in time, and notify the maintenance personnel to repair in time

3 monitoring and management of power transformation and distribution system

3.1 for each substation